I believe it’s protected to say that a sign of religious maturity will be a boldness to share the excellent news or Gospel of Jesus Christ. Roman 1:sixteen implies, “I am not ashamed of the Gospel due to the fact it is undoubtedly the electrical OG0-092 power of God for that salvation of absolutely everyone who thinks…” What an incredible verse and a person which nearly every Christian The Open Group TOGAF 9 TOGAF 9 Part 2 should have as their motto. It may be completely one which ought to be handed on to all we fulfill given that the The Open Group OG0-092 vce Lord potential clients. That is a pleasing Bible school action to aid your youngsters memorize this wonderful Scripture to ensure that they could be described as being a really minimal bolder the next time they share Jesus with their pals. It truly is named The Open Group TOGAF 9 TOGAF 9 Part 2 “Pass OG0-092 the ability.”

OG0-092 Exam Bundle

OG0-092 exam bundle
Vendor The Open Group
Certification TOGAF 9
Exam OG0-092
Exam Name TOGAF 9 Part 2
Product OG0-092 Exam Bundle
Discount 30%
Exam Price $97
Purchase

The Open Group OG0-092 Exam Sample Questions

Question: 1

Scenario: Rollins Manufacturing

Please read this scenario prior to answering the question

Rollins Manufacturing is a major supplier in the automotive industry, headquartered in Cleveland, Ohio with manufacturing plants in Chicago, Sao Paulo, Stuttgart, Yokohama, and Seoul. Each of these plants has been operating its own Manufacturing Requirements Planning (MRPII) system, production scheduling, and custom developed applications that drive the automated production equipment at each plant.

Rollins is implementing lean manufacturing principles to minimize waste and improve the efficiency of all of its production operations. During a recent exercise held for internal quality improvement, it was determined that a significant reduction in process waste could be achieved by replacing the current MRPII and scheduling systems with a common Enterprise Resource Planning (ERP) system located in the Cleveland data center. This central system would provide support to each of the plants replacing the functionality in the existing systems. It would also eliminate the need for full data centers at each of the plant facilities. A reduced number of IT staff could support the remaining applications. In some cases, a third-party contractor could provide those staff.

The Rollins Enterprise Architecture department has been operating for several years and has mature, well-developed architecture governance and development processes that are strongly based on TOGAF 9.At a recent meeting, the Architecture Review Board approved a Request for Architecture Work from the Chief Engineer of Global Manufacturing Operations who is the project sponsor. The request covered the initial architectural investigations and the development of a comprehensive architecture to plan the transformation.

The Common ERP Deployment architecture project team has now been formed, and the project team has been asked to develop an Architecture Vision that will achieve the desired outcomes and benefits. Some of the plant managers have expressed concern about the security and reliability of driving their MRPII and production scheduling from a central system located in Cleveland. The Chief Engineer wants to know how these concerns can be addressed.

Refer to the Rollins Manufacturing Scenario:

You are serving as the Lead Enterprise Architect for the Common ERP Deployment architecture project.

One of the earliest initiatives in the Enterprise Architecture program at Rollins was the definition of a set of IT principles and architecture principles that are well aligned with the overall enterprise principles. These now need to be updated to address the concerns raised.

You have been asked to select a set of principles most appropriate for guiding the team to define a robust solution.

[Note: You should assume that Rollins has adopted the example set of principles that are listed and defined in TOGAF 9, Section 23.6.]

Based on TOGAF 9, which of the following is the best answer?

  1. Common-use Applications, Data is Shared, Data is Accessible, Data is Secure, Interoperability, Control Technical Diversity.
  2. Business Continuity, Service-orientation, Data is Accessible, Data is Secure, Responsive Change Management.
  3. Maximize Benefit to the Enterprise, Business Continuity, Common-use Applications, Data is Shared, Data is Accessible, Data is Secure.
  4. Information Management is Everybody’s Business, IT Responsibility, Data Trustee, Technology Independence, Responsive Change Management.


Answer: D

Question: 5

Scenario: Vittronics Ltd.

Please read this scenario prior to answering the question

Vittronics Ltd. is a leading medical device manufacturer in the highly competitive market for Migraine Headache Pain Management (MHPM) devices. These tiny wireless devices are implanted in the brain and can deliver a precise electric shock when the wearable Pain Control Unit (PCU) detects an increase in stress induced by the onset of a migraine headache.

This technology will be a breakthrough in the treatment of this condition, and several competitors are striving to be the first to introduce a product into the market. However, all of them must demonstrate the effectiveness and safety of their products in a set of clinical trials that will satisfy the regulatory requirements of the countries in the target markets.

The Enterprise Architecture group at Vittronics has been engaged in an architecture development project to create a Secure Private Immersive Collaborative Environment (SPICE) that will allow researchers at its product development laboratories worldwide to share information about their independent clinical trials.

The Vittronics Enterprise Architecture group is a mature organization that has been utilizing TOGAF for several years. They have recently upgraded to TOGAF 9. The Vittronics Architecture Development Method (VADM) is strictly based on the TOGAF 9 Architecture Development Method (ADM) with extensions required to support current good manufacturing practices and good laboratory practices in their target markets.

The SPICE project team has now completed the Business, Information Systems, and Technology Architecture phases and has produced a complete set of deliverables for each phase. Due to the highly sensitive nature of the information that is managed in SPICE, special care was taken to ensure that each architecture domain included an examination of the security and privacy issues that are relevant for each domain. A corresponding SPICE Security Architecture has been defined.

The Executive Vice President for Clinical Research is the sponsor of the Enterprise Architecture activity.

Refer to the Vittronics Ltd Scenario:

You are serving as the Lead Architect for the SPICE project team.

As required by TOGAF, the SPICE project team res completed a Business Transformation Readiness Assessment in Phase A (Architecture Vision). In that assessment, it was determined that there are risks associated with the adoption of the Immersive Collaborative Environment. Despite a clear expression of the vision and the business need for utilizing SPICE to accelerate the clinical trials, the researchers have been resisting the change because of concerns about safeguarding individually identifiable information about the subjects who were participating in the trials.

You have been asked to recommend how this situation be managed in the implementation planning phases.

Based on TOGAF 9, which of the following is the best answer?

  1. You decide that in Phase E, the team create an overall solutions strategy that can guide the Target Architecture implementation and structure the Transition Architectures. You check that there is consensus before proceeding.
  2. You decide to return to Phase A, where the team should brainstorm a technical solution that mitigates the residual risks presented by the privacy issue. Then, during Phase D, you will direct the team to develop an Architecture Building Block to manage the security risks. After that, the team should select Solution Building Blocks that mitigate all of the identified risks and revise the Requirements Impact Statement to reflect the changes to the high-level solutions strategy and migration plan.
  3. You decide that in Phase E, the team review the Business Transformation Readiness Assessment and identify, classify, and mitigate the risks associated with the identified readiness factors. If the risks can be satisfactorily mitigated, then you would continue to define a high-level solutions strategy that includes the Transition Architectures needed to make the change culturally and technically feasible.
  4. You decide that in Phase E, the team determines an approach to implementing an overall strategic direction that will address and mitigate the risks identified.


Answer: B

OG0-092 Exam Bundle Contains

The Open Group OG0-092 Exam Preparation Products Features OG0-092 questions pdf OG0-092 practice test
OG0-092 Product Demo available available
OG0-092 Exam Free Updates available available
Special Discount on OG0-092 Preparation Material available available
Security and Privacy available available
OG0-092 Practice Test Engine available available
OG0-092 PDF Questions & Answers available available
100% Money Back on OG0-092 VCE available available
24/7 Support available available
Price $69 $69
Add to Cart

Phonological recognition may very well be the consciousness of each individual of the seems of language. It is the capacity to hear and distinguish seems.

You can discover 5 capabilities linked to phonological recognition. These include:Listening: It certainly is critical that little youngsters have some fundamental techniques The Open Group OG0-092 Study TOGAF 9 Part 2 in learning to shell out attention for particular troubles to begin comprehension phonological awareness.

Phrases and sentences: Tiny kids really want to handle to TOGAF 9 distinguish what an expression is also to know that sentences are created up of text.

Rhyming: Recognizing rhymes and being able to make their OG0-092 questions TOGAF 9 Part 2 own rhymes could be the upcoming period.

Syllables: The next action is breaking text into syllables. Youthful little ones The Open Group ought to be ready to rely syllables and blend them with each and every other.

Onset and rime: This is often definitely breaking syllables into two parts. The onset TOGAF 9 The Open Group OG0-092 TOGAF 9 Part 2 is many of the items before the vowel inside of a quite syllable, the rime will be the vowel and practically almost everything shortly following. Such as; the /c/ in cat could be the onset, the /at/ might be the rime. The /fr/ in frog could OG0-092 questions TOGAF 9 Part 2 be the onset, the /og/ could possibly be the rime.

These competencies direct young children to find out to blend and phase individual appears TOGAF 9 and phonemes. Blending (placing sounds together) is unquestionably the basis for reading. So The Open Group you can mix youthful young children need to just take OG0-092 questions TOGAF 9 Part 2 specific sounds, place them collectively and occur up that has a recognizable phrase. For instance in some circumstances a toddler could provide the means to set a handful of appears along with just one yet another /c/ /a/ /t/, and nonetheless not understand that the term TOGAF 9 OG0-092 Vce TOGAF 9 Part 2 indicates cat. Segmenting (obtaining words and phrases apart into person sounds) will be the foundation for composing. It can be an obstacle to understand to listen to the entire private appears in a pretty time period.

These competencies prepare kid’s ears to hear and technique facts and OG0-092 Vce TOGAF 9 Part 2 specifics expected for examining and crafting. It really The Open Group is essential to start out youthful in supporting small children produce these tactics. No matter TOGAF 9 no matter whether within an official preschool time, or everyday every time apply, instructing these tactics might be rather a purely natural element real OG0-092 questions TOGAF 9 Part 2 of day-to-day. There are actually an abundance of pleasure and engaging procedures to abide by these tactics. The following definitely are a handful of feelings:

Apply giving 1 action, then two section, following which three phase pointers.

Say a brief sentence and help your son or daughter consider TOGAF 9 OG0-092 questions TOGAF 9 Part 2 an action forward for each phrase whilst during the sentence.

Make silly rhymes together with the kid’s identify, along with other common names.

Commence out by breaking a The Open Group phrase into onset and rime and like /fr/ /og/. You say the 2 sections aloud and have the child location OG0-092 questions TOGAF 9 Part 2 them again once again together. Ultimately, because the strategy success in becoming simpler, supply the child a phrase and likewise have her or TOGAF 9 him crack it into onset and rime. Here is the difficult basic principle since it is just not really purely natural, so it The Open Group OG0-092 Study TOGAF 9 Part 2 takes lots of notice. It’s an incredibly essential that little small children discover the best way to period onset and rime, due to the fact following they’ve mastered it, blending and segmenting distinct particular person sounds is way a lot easier.

When you assistance your The Open Group son or TOGAF 9 OG0-092 questions TOGAF 9 Part 2 daughter purchase these phonological recognition skills, mastering to analyze and publish will come to be a lot less of an obstacle treatment.

Question: 1

Scenario: Rollins Manufacturing

Please read this scenario prior to answering the question

Rollins Manufacturing is a major supplier in the automotive industry, headquartered in Cleveland, Ohio with manufacturing plants in Chicago, Sao Paulo, Stuttgart, Yokohama, and Seoul. Each of these plants has been operating its own Manufacturing Requirements Planning (MRPII) system, production scheduling, and custom developed applications that drive the automated production equipment at each plant.

Rollins is implementing lean manufacturing principles to minimize waste and improve the efficiency of all of its production operations. During a recent exercise held for internal quality improvement, it was determined that a significant reduction in process waste could be achieved by replacing the current MRPII and scheduling systems with a common Enterprise Resource Planning (ERP) system located in the Cleveland data center. This central system would provide support to each of the plants replacing the functionality in the existing systems. It would also eliminate the need for full data centers at each of the plant facilities. A reduced number of IT staff could support the remaining applications. In some cases, a third-party contractor could provide those staff.

The Rollins Enterprise Architecture department has been operating for several years and has mature, well-developed architecture governance and development processes that are strongly based on TOGAF 9.At a recent meeting, the Architecture Review Board approved a Request for Architecture Work from the Chief Engineer of Global Manufacturing Operations who is the project sponsor. The request covered the initial architectural investigations and the development of a comprehensive architecture to plan the transformation.

The Common ERP Deployment architecture project team has now been formed, and the project team has been asked to develop an Architecture Vision that will achieve the desired outcomes and benefits. Some of the plant managers have expressed concern about the security and reliability of driving their MRPII and production scheduling from a central system located in Cleveland. The Chief Engineer wants to know how these concerns can be addressed.

Refer to the Rollins Manufacturing Scenario:

You are serving as the Lead Enterprise Architect for the Common ERP Deployment architecture project.

One of the earliest initiatives in the Enterprise Architecture program at Rollins was the definition of a set of IT principles and architecture principles that are well aligned with the overall enterprise principles. These now need to be updated to address the concerns raised.

You have been asked to select a set of principles most appropriate for guiding the team to define a robust solution.

[Note: You should assume that Rollins has adopted the example set of principles that are listed and defined in TOGAF 9, Section 23.6.]

Based on TOGAF 9, which of the following is the best answer?

  1. Common-use Applications, Data is Shared, Data is Accessible, Data is Secure, Interoperability, Control Technical Diversity.
  2. Business Continuity, Service-orientation, Data is Accessible, Data is Secure, Responsive Change Management.
  3. Maximize Benefit to the Enterprise, Business Continuity, Common-use Applications, Data is Shared, Data is Accessible, Data is Secure.
  4. Information Management is Everybody’s Business, IT Responsibility, Data Trustee, Technology Independence, Responsive Change Management.


Answer: D

What may perhaps be considerably more basic than reading?What improved gift are you able OG0-092 vce and test to getting a guardian give to the Open Group TOGAF 9 Part 2 youngster than that in the functionality to OG0-092 vce and test definitely become a superb reader?How can you achieve these types of a fantastic TOGAF 9 legacy? The Open Group The Open Group OG0-092 TOGAF 9 Part 2 Let’s establish.

Have you at any time tried out working with weights? It’s genuinely hard!It’s going to take significantly a lot more work and tricky function. Every one of us understand that each day daily life is form of a race we have been working. Several of us carry unneeded baggage in our lifestyle that Examcollection OG0-092 Online can get inside the approach for our jogging the race God has marked out for us. Hebrews twelve:1 states this:”…permit us toss off anything at all that The Open Group TOGAF 9 Part 2 hinders along with the sin that so simply entangles. And permit us run with perseverance the race marked out for us…”Sin is certainly the worst baggage OG0-092 Coupons of all. It certainly hinders us from functioning the very best race we possibly can. Listed here is really an enjoyment Sunday Faculty lesson from the Bible I feel your very little ones will take pleasure in that could support them grasp this verse in addition the serious reality it teaches. It is The Open Group OG0-092 exam cram named The Open Group TOGAF 9 TOGAF 9 Part 2 “Run the Race”.

Maharashtra will be the 3rd most vital ailment in India pertaining to house and populace. It could possibly be common for its outstanding providers in every single with the varied quantities of schooling. You’ll find thirty 5 districts exactly where by Examcollection OG0-092 Paper Pune as among the them is called the spot exactly where you may well get one of the most helpful TOGAF 9 TOGAF 9 Part 2 instruction within the point out. Apart from Pune, you can discover other districts like Mumbai, Nagpur, Aurangabad, Kolhapur, and Ahmednagar amid OG0-092 Book other people exactly the place high-quality instruction is additionally at arm’s achieve.

Almost each individual man or lady is educated that high-quality education and studying, the higher it will get, improve to generally be dearer. You’d should dedicate a wonderful whole The Open Group TOGAF 9 TOGAF 9 Part 2 of OG0-092 Study cash if you want to perform that. Though a scholarship is frequently a very good cost-effective way too you might advantage from, they are really not fast to get. You truly should get paid it. Discovering a scholarship could probably be Examcollection OG0-092 exam actually disheartening but the rewards may well be priceless. You are going to understand that it’s benefit the obstacle TOGAF 9 TOGAF 9 Part 2 so if you previously know that you have the brains in addition the will and courage to go soon after your motivation, OG0-092 Book you could potentially take a look at implementing for a Maharashtra scholarship.

We have now look to an age in which amounts of competitors is pretty much in all places. You might have the best edge in case you arm The Open Group TOGAF 9 TOGAF 9 Part 2 your self OG0-092 Book with know-how as well as the very good schooling in order for you to deal with and tackle distinctive duties. It is definitely not merely the talent which might be needed but furthermore what we all know. We now have to Examcollection OG0-092 Paper accept that we have now been all influenced but are up for your amount of opposition probably for TOGAF 9 TOGAF 9 Part 2 that sake of other individuals, like our beloved types, or for ourselves. Do you have to have this sort of eyesight, then you OG0-092 Study certainly unquestionably just may well receives a commission a Maharashtra scholarship.

In the event you are interested to avail of the Maharashtra scholarship, you merely really need to satisfy up with the subsequent conditions and terms: you may need The Open Group TOGAF 9 TOGAF 9 Part 2 to come to Examcollection OG0-092 Paper be a long term resident of Maharashtra, you have got no less than 60% marks to the 12th conventional assessment for grad courses at the same time to be a bare minimum quantity of 55% marks inside the pointed out course OG0-092 Tests do you have to are vying for set up grad lessons. This can be anticipated for your TOGAF 9 TOGAF 9 Part 2 to begin with endeavor. It is really essential to also take into consideration that once-a-year dollars movement of the respective moms and fathers that OG0-092 Study need to not exceed to Rs.two.fifty lakhs. You should to purchase an admission while using the in the beginning calendar 12 months from any recognized college within a pretty global place.

The utmost age limit for the Maharashtra The Open Group TOGAF 9 TOGAF 9 Part 2 scholarship is 35. There’ll OG0-092 Tests be eight scholarships for getting granted for graduation classes, and an additional seventeen for the submit graduation. Make certain that you end the method beneath the Maharashtra scholarship or else the amount of the scholarship could be recovered. Once you have OG0-092 Coupons concluded the class, you’ve got the selection to voluntarily refund no less than 10% with the TOGAF 9 TOGAF 9 Part 2 volume of money specified to you personally. This seriously is for that social just fund while in the Maharashtra govt. There’s undoubtedly no other format Examcollection OG0-092 exam made available with all the Maharashtra scholarship variety. You could possibly contain the official application styles at the small business workplace to the distinct district social welfare officer. The shape is totally free of desire. You The Open Group TOGAF 9 TOGAF 9 Part 2 could be to fill it OG0-092 Coupons in together with the specific details along with the expected paperwork and need to be submitted to the Director of Social Welfare.

Question: 5

Scenario: Vittronics Ltd.

Please read this scenario prior to answering the question

Vittronics Ltd. is a leading medical device manufacturer in the highly competitive market for Migraine Headache Pain Management (MHPM) devices. These tiny wireless devices are implanted in the brain and can deliver a precise electric shock when the wearable Pain Control Unit (PCU) detects an increase in stress induced by the onset of a migraine headache.

This technology will be a breakthrough in the treatment of this condition, and several competitors are striving to be the first to introduce a product into the market. However, all of them must demonstrate the effectiveness and safety of their products in a set of clinical trials that will satisfy the regulatory requirements of the countries in the target markets.

The Enterprise Architecture group at Vittronics has been engaged in an architecture development project to create a Secure Private Immersive Collaborative Environment (SPICE) that will allow researchers at its product development laboratories worldwide to share information about their independent clinical trials.

The Vittronics Enterprise Architecture group is a mature organization that has been utilizing TOGAF for several years. They have recently upgraded to TOGAF 9. The Vittronics Architecture Development Method (VADM) is strictly based on the TOGAF 9 Architecture Development Method (ADM) with extensions required to support current good manufacturing practices and good laboratory practices in their target markets.

The SPICE project team has now completed the Business, Information Systems, and Technology Architecture phases and has produced a complete set of deliverables for each phase. Due to the highly sensitive nature of the information that is managed in SPICE, special care was taken to ensure that each architecture domain included an examination of the security and privacy issues that are relevant for each domain. A corresponding SPICE Security Architecture has been defined.

The Executive Vice President for Clinical Research is the sponsor of the Enterprise Architecture activity.

Refer to the Vittronics Ltd Scenario:

You are serving as the Lead Architect for the SPICE project team.

As required by TOGAF, the SPICE project team res completed a Business Transformation Readiness Assessment in Phase A (Architecture Vision). In that assessment, it was determined that there are risks associated with the adoption of the Immersive Collaborative Environment. Despite a clear expression of the vision and the business need for utilizing SPICE to accelerate the clinical trials, the researchers have been resisting the change because of concerns about safeguarding individually identifiable information about the subjects who were participating in the trials.

You have been asked to recommend how this situation be managed in the implementation planning phases.

Based on TOGAF 9, which of the following is the best answer?

  1. You decide that in Phase E, the team create an overall solutions strategy that can guide the Target Architecture implementation and structure the Transition Architectures. You check that there is consensus before proceeding.
  2. You decide to return to Phase A, where the team should brainstorm a technical solution that mitigates the residual risks presented by the privacy issue. Then, during Phase D, you will direct the team to develop an Architecture Building Block to manage the security risks. After that, the team should select Solution Building Blocks that mitigate all of the identified risks and revise the Requirements Impact Statement to reflect the changes to the high-level solutions strategy and migration plan.
  3. You decide that in Phase E, the team review the Business Transformation Readiness Assessment and identify, classify, and mitigate the risks associated with the identified readiness factors. If the risks can be satisfactorily mitigated, then you would continue to define a high-level solutions strategy that includes the Transition Architectures needed to make the change culturally and technically feasible.
  4. You decide that in Phase E, the team determines an approach to implementing an overall strategic direction that will address and mitigate the risks identified.


Answer: B

It really is back again once again to high faculty time. Even for homeschoolers like us, it really is excellent to possess a refreshing begin off. A couple of my mates homeschool yr spherical, but I like possessing time that you should recoup, rethink, recharge, and refresh. How about you? Setting up back again to “homeschool” is pleasurable. However, there are some incredibly OG0-092 Coupons basic points which you may do that can help receive the college 12 months off on your excellent start. A person. Thoroughly clean up out, discard, and control. Eliminate matters that materialize The Open Group TOGAF 9 Part 2 for being weighing you down. You really will not will need that tattered out-of-date spelling curriculum. Actually, you are going to locate terrific on line opportunities accessible. Homeschoolers are curriculum collectors… OG0-092 Sheets definitely don’t join the peer strain. Preserve whatever you really have to have, and endorse or donate whatsoever you won’t. In the event you advertise, you might fund #3 down underneath. A cluttered schoolroom is admittedly a haven of distraction for the higher education pupil! Keep on to help keep it neat and organized in addition to your scholar will likely be significantly OG0-092 Sheets less The Open Group TOGAF 9 TOGAF 9 Part 2 distracted from mastering.

Homeschooling is made up of generating some alternatives. At the start, numerous of these choices need acquiring curriculum or publications. In this article are a few common concerns people make and also Examcollection OG0-092 Tests the remedies that will aid you avert them:

1. Inside a hurry to acquire curriculum – After you arrive to some determination to residence higher education TOGAF 9 Part 2 you could potentially be thrilled to head Examcollection OG0-092 Paper out and buy something you see. Really perhaps the most critical make any difference you can be able to do to prevent this mistake ought to be to arrive at know The Open Group your Examcollection OG0-092 Paper child/children. Look at them for really some time when they enjoy and communicate with some other folks. Do TOGAF 9 TOGAF 9 Part 2 they prefer to be by itself or with many other individuals? Do they appreciate Examcollection OG0-092 Sheets learning? Do they appreciate filling in notebooks or workbooks? Do they loathe examining via? These are generally typically all concerns that should assist you determine how your son or daughter learns finest. Examcollection OG0-092 Sheets You may be capable of also take into consideration owning them TOGAF 9 Part 2 get an understanding design and style assessment to check out how they locate out best. When there’s a chance The Open Group you’re observing OG0-092 cram and test your son or daughter, start identifying the quite a few dwelling college techniques along with the way they might match in together with your individuality which of the child/children.

two. Obtain a curriculum OG0-092 cram and test largely due to the TOGAF 9 TOGAF 9 Part 2 fact somebody else likes it – Have you at any time long gone into a restaurant that any individual else just raved about this means you didn’t think Examcollection OG0-092 Paper it certainly was almost everything particular otherwise you hated their food items? Building curriculum choices are surely more important than selecting a cafe, however the degree is because somebody The Open Group TOGAF 9 Part 2 else likes an examcollection OG0-092 Tests curriculum, it will not likely signify that it truly is correct for you personally alongside along with your spouse and children or that you simply just will like it. Take the advice OG0-092 cram and test from that human being right after which analyze it thoroughly to produce certain it suits in with the character together with the TOGAF 9 TOGAF 9 Part 2 learning sorts of your little ones.

three. Get far extra than OG0-092 cram and test you can need to have – Fully grasp that not every single subject matter desires a curriculum and that you do not ought to order each part with The Open Group the curriculum. Science and Examcollection OG0-092 Sheets Record can easily be taught from excellent guides and lifestyle encounters. Math will likely be TOGAF 9 Part 2 taught utilizing workbooks, but may very well be enhanced with earnings, M&Ms and other hands on resources. Examcollection OG0-092 Paper If you have taken some time to write down your goals and what you assume you call for each baby, it is possible to keep away from acquiring too a lot and OG0-092 cram and test acquiring frustrated. Remember that less is better. You’ll TOGAF 9 TOGAF 9 Part 2 be able to normally get additional later or add to what you have. In case you have too a The Open Group great deal to work with OG0-092 cram and test it’s possible you’ll get frustrated and may perhaps probably frustrate your sons or daughters by piling on too considerably work and causing them to lose their desire to recognize.

Everyone is likely to Examcollection OG0-092 Tests order TOGAF 9 Part 2 at least Just one level that they did not want. You can’t avoid all buying errors, but with a plan and some guidance it’s possible you’ll receive much extra of what OG0-092 cram and test you need and less of what you need to do not require. Sit back and discover your goals for your sons or daughters and what you The Open Group TOGAF 9 TOGAF 9 Part 2 want to accomplish taking into account Examcollection OG0-092 Sheets their learning style, which means you will steer clear of lots of problems when it comes to getting residence faculty curriculum.

Question: 1

Scenario: Rollins Manufacturing

Please read this scenario prior to answering the question

Rollins Manufacturing is a major supplier in the automotive industry, headquartered in Cleveland, Ohio with manufacturing plants in Chicago, Sao Paulo, Stuttgart, Yokohama, and Seoul. Each of these plants has been operating its own Manufacturing Requirements Planning (MRPII) system, production scheduling, and custom developed applications that drive the automated production equipment at each plant.

Rollins is implementing lean manufacturing principles to minimize waste and improve the efficiency of all of its production operations. During a recent exercise held for internal quality improvement, it was determined that a significant reduction in process waste could be achieved by replacing the current MRPII and scheduling systems with a common Enterprise Resource Planning (ERP) system located in the Cleveland data center. This central system would provide support to each of the plants replacing the functionality in the existing systems. It would also eliminate the need for full data centers at each of the plant facilities. A reduced number of IT staff could support the remaining applications. In some cases, a third-party contractor could provide those staff.

The Rollins Enterprise Architecture department has been operating for several years and has mature, well-developed architecture governance and development processes that are strongly based on TOGAF 9.At a recent meeting, the Architecture Review Board approved a Request for Architecture Work from the Chief Engineer of Global Manufacturing Operations who is the project sponsor. The request covered the initial architectural investigations and the development of a comprehensive architecture to plan the transformation.

The Common ERP Deployment architecture project team has now been formed, and the project team has been asked to develop an Architecture Vision that will achieve the desired outcomes and benefits. Some of the plant managers have expressed concern about the security and reliability of driving their MRPII and production scheduling from a central system located in Cleveland. The Chief Engineer wants to know how these concerns can be addressed.

Refer to the Rollins Manufacturing Scenario:

You are serving as the Lead Enterprise Architect for the Common ERP Deployment architecture project.

One of the earliest initiatives in the Enterprise Architecture program at Rollins was the definition of a set of IT principles and architecture principles that are well aligned with the overall enterprise principles. These now need to be updated to address the concerns raised.

You have been asked to select a set of principles most appropriate for guiding the team to define a robust solution.

[Note: You should assume that Rollins has adopted the example set of principles that are listed and defined in TOGAF 9, Section 23.6.]

Based on TOGAF 9, which of the following is the best answer?

  1. Common-use Applications, Data is Shared, Data is Accessible, Data is Secure, Interoperability, Control Technical Diversity.
  2. Business Continuity, Service-orientation, Data is Accessible, Data is Secure, Responsive Change Management.
  3. Maximize Benefit to the Enterprise, Business Continuity, Common-use Applications, Data is Shared, Data is Accessible, Data is Secure.
  4. Information Management is Everybody’s Business, IT Responsibility, Data Trustee, Technology Independence, Responsive Change Management.


Answer: D

Question: 5

Scenario: Vittronics Ltd.

Please read this scenario prior to answering the question

Vittronics Ltd. is a leading medical device manufacturer in the highly competitive market for Migraine Headache Pain Management (MHPM) devices. These tiny wireless devices are implanted in the brain and can deliver a precise electric shock when the wearable Pain Control Unit (PCU) detects an increase in stress induced by the onset of a migraine headache.

This technology will be a breakthrough in the treatment of this condition, and several competitors are striving to be the first to introduce a product into the market. However, all of them must demonstrate the effectiveness and safety of their products in a set of clinical trials that will satisfy the regulatory requirements of the countries in the target markets.

The Enterprise Architecture group at Vittronics has been engaged in an architecture development project to create a Secure Private Immersive Collaborative Environment (SPICE) that will allow researchers at its product development laboratories worldwide to share information about their independent clinical trials.

The Vittronics Enterprise Architecture group is a mature organization that has been utilizing TOGAF for several years. They have recently upgraded to TOGAF 9. The Vittronics Architecture Development Method (VADM) is strictly based on the TOGAF 9 Architecture Development Method (ADM) with extensions required to support current good manufacturing practices and good laboratory practices in their target markets.

The SPICE project team has now completed the Business, Information Systems, and Technology Architecture phases and has produced a complete set of deliverables for each phase. Due to the highly sensitive nature of the information that is managed in SPICE, special care was taken to ensure that each architecture domain included an examination of the security and privacy issues that are relevant for each domain. A corresponding SPICE Security Architecture has been defined.

The Executive Vice President for Clinical Research is the sponsor of the Enterprise Architecture activity.

Refer to the Vittronics Ltd Scenario:

You are serving as the Lead Architect for the SPICE project team.

As required by TOGAF, the SPICE project team res completed a Business Transformation Readiness Assessment in Phase A (Architecture Vision). In that assessment, it was determined that there are risks associated with the adoption of the Immersive Collaborative Environment. Despite a clear expression of the vision and the business need for utilizing SPICE to accelerate the clinical trials, the researchers have been resisting the change because of concerns about safeguarding individually identifiable information about the subjects who were participating in the trials.

You have been asked to recommend how this situation be managed in the implementation planning phases.

Based on TOGAF 9, which of the following is the best answer?

  1. You decide that in Phase E, the team create an overall solutions strategy that can guide the Target Architecture implementation and structure the Transition Architectures. You check that there is consensus before proceeding.
  2. You decide to return to Phase A, where the team should brainstorm a technical solution that mitigates the residual risks presented by the privacy issue. Then, during Phase D, you will direct the team to develop an Architecture Building Block to manage the security risks. After that, the team should select Solution Building Blocks that mitigate all of the identified risks and revise the Requirements Impact Statement to reflect the changes to the high-level solutions strategy and migration plan.
  3. You decide that in Phase E, the team review the Business Transformation Readiness Assessment and identify, classify, and mitigate the risks associated with the identified readiness factors. If the risks can be satisfactorily mitigated, then you would continue to define a high-level solutions strategy that includes the Transition Architectures needed to make the change culturally and technically feasible.
  4. You decide that in Phase E, the team determines an approach to implementing an overall strategic direction that will address and mitigate the risks identified.


Answer: B